A logo for the Press Architecture brand.
Project

BUILD-TO-SUIT FABRICATION FACILITY

SPOKANE, WA

Tilt-up concrete? Sure, but how about tilt-up mass timber? This fabrication facility was conceived with 5-ply CLT bearing walls fully supporting the roof structure. Perimeter steel columns were added to support a bridge crane and rails.

NOTEWORTHY

Permit obtained 2022 in Spokane, WA

LET’S WORK TOGETHER

GET IN TOUCH

"*" indicates required fields

menu linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram